// Project Documentation

// Project Information

Name, number, designer, code and system settings

Project Status

Authority Having Jurisdiction

PE Sealing
Optional. Required only when exporting PE-sealed PDFs. Engineer of Record must hold an active license in the project's state.

Field Access
Optional. Set a password to let field users (GC, EC, Cx, inspector) access this project via the QR code on signed PDFs. Password is shown in plaintext once at creation or rotation — save it somewhere safe, then communicate it to field users directly.
Optional. Pin the project location on a map. Used to corroborate field-event audit data — Orizon1 flags submissions far from the pin as defensibility anomalies for engineering audit purposes.
No location pinned yet.
Loading…

Project Team

System Settings

// CIN

Control Intent Narrative — auto-generated, fully editable
/// No rooms yet Add rooms to Control Intent Narrative

// Sequence

Sequence of Operations — step-by-step system behavior per room
/// No rooms yet Add rooms to Sequence of Operations

// Matrix

Room-by-room controls matrix — all setpoints in one view

// Compliance

Energy code compliance check — room by room
Add rooms to view compliance status.

// Setpoints

All adjustable values — ▴adj = field-adjustable at commissioning
Add rooms to view the setpoint summary.

// Punch List

Commissioning deficiency log
Deficiency Log
Log New Deficiency

Record an item found during site visits.

// CX

Commissioning checklist and report
Commissioning Checklist
Add rooms to use the Cx Checklist.
Commissioning Report

// Revisions

Project revision history. Room add/delete, status approvals, and energy code changes are logged automatically.
Revision History
MANUAL — entries you logged AUTO — system-logged events
Log New Revision

Manually note a project change.

// Schedule

Controls schedule — device count summary by room
Project Catalog
Per-Room Quantities

// Legends

Controls legend and lighting legend
Controls Legend
Lighting Legend

// Budget

Cost estimate based on device counts and labor rates
EC Wiring Estimates
Estimated line-voltage and low-voltage wiring costs per room based on electrical data. Edit unit rates below.
Unit Rates

// Reports

Energy modeling, sustainability reports, permit compliance, post-occupancy verification, and submittal automation
ESG / Sustainability Reports
Generate standardized sustainability reports from the energy modeling data above. All reports disclose lighting-only scope clearly; whole-building integration is the designer or sustainability consultant's responsibility.
Submittal Automation
Combined submittal package with auto-linked manufacturer spec sheets. Builds from the Submittals roster in Project Admin; spec sheets older than 90 days are flagged as potentially stale.
AHJ Permit Compliance
Permit-ready code compliance report tailored to the project's jurisdiction. Overlays state and city amendments on top of the base ASHRAE / IECC code. Set projectState (and optional projectCity) in Project Parameters to drive the resolver.
Continuous Verification
Post-occupancy monitoring. Upload BMS metering data (CSV with timestamp / meter_id / kWh columns) to verify as-installed operation matches the as-designed energy model. Default drift threshold is 15%.

// Integrations

Files for downstream tools and trades — commissioning exports, manufacturer adapters, and BIM / FM data interop
Commissioning Exports
Files the commissioning agent, controls contractor, or vendor-specific tool consumes. The Orizon1-native DALI-2 XML is the canonical representation; manufacturer adapters translate it (or the broader project data) into the vendor's expected import format. All vendor adapter outputs are best-effort translations — verify imports in the actual commissioning tool before production use.
DALI-2 Commissioning Export
Orizon1-native DALI-2 commissioning XML per IEC 62386-103. Maps the project's setpoint model to bus addresses, groups, scenes, and sensor pairings. Vendor-specific adapters (Lutron Vive, Helvar Designer, Tridonic Cockpit, and 11 more) appear in the rows below.
Manufacturer-specific adapters (best-effort translations):
Non-DALI proprietary systems:
Theatrical / automation / integrator systems:
Specialized / regional systems:
Other Controls Protocol Exports
Protocol-specific configuration files for non-DALI-2 systems. 0-10V projects get a pull schedule; BMS-integrated projects get a BACnet object list; Bluetooth Mesh projects get a Casambi-compatible network config.
BIM & FM Data Interop
Building information exchange formats for downstream coordination. gbXML for energy modelers (eQUEST, EnergyPlus, IES VE), IFC4 for architectural BIM tools (Revit, ArchiCAD), and COBie for the owner's facilities team handoff.

// Submittal Package

Products, equipment, and shop drawings for designer review.

// Transmittal Log

Track document packages sent to the project team.

// RFI Log

Formal requests for information from the project team.
All Open Pending Answered Closed
Sort: # Num Status Ball in Court

// Change Order Log

Approved scope, cost, and schedule modifications.

// Warranty Register

Auto-populated from the controls schedule. Default term is 5 years (or as specified in the device library). Edit term, start date, and contact per item.

// Audit Log

All project changes by all team members. Last 100 entries shown.

// PDF Export Options

Control what is included when you click Print / Save PDF. Settings are saved with the project.
Photometric heatmaps
Embeds a colour footcandle heatmap for each room calculated in the Photometrics tab. Only available when photometric data exists.
Sensor coverage maps
Embeds the sensor coverage diagram from the Design Takeoff canvas. Only available when devices are placed.
Panel schedule & load calculation
Includes the permit-ready panel schedule and NEC load calculation summary. Only appears when panels are configured in the Circuit Map tab.
Budget estimate
Includes the controls budget estimate. Can be disabled for deliverables where cost data should remain internal.
Energy modeling
Includes operating cost, ASHRAE 90.1-2022 baseline comparison, payback, demand savings (if $/kW set), and eGRID-based carbon footprint. Only available when rooms have connected watts.
Tip: For a lean PDF (email delivery, field reference) uncheck heatmaps and coverage. For a full permit package keep all sections enabled.

// Occupancy Schedule Profiles

Create named schedules (e.g. "Office Hours", "24/7") and assign them to rooms in the Time-Switch section. Changes propagate instantly to all assigned rooms and appear in the SOO and CIN documents.

// Substitution Review

Value-engineering review of proposed product substitutions.

// Spec

Division 26 specification section — auto-generated, fully editable
Click Regenerate to produce a draft specification section from your project configuration.

// One-Line

Auto-generated electrical one-line diagrams per room
All Rooms Occ. Sensor Daylight Emergency

// Circuit Map

Panel · Circuit · Room · Load · Wire

// Voltage Drop

Circuit voltage drop calculator per NEC 210.19
Circuit Calculator

Saved Circuits

No circuits saved yet.
DALI Bus & 0-10V Signal Voltage Drop
DALI: length in meters, IEC 62386 max 300m / 250mA.  |  0-10V: length in feet, 22 AWG shielded assumed.

// Compare

Side-by-side energy code compliance comparison
Room / Requirement Current Code Compare Code
Add rooms to compare codes.

// Dashboard

At-a-glance project health summary
Add rooms to see the project dashboard.

// O&M

Owner's manual — auto-generated, fully editable
Click Regenerate to build the O&M Manual from your project data.